EV Charging
EV Charger Installation
Level 2 charger installs for homes and businesses. The name fits the work for once.
What the install involves
- Panel capacity check — most modern panels handle a 50A circuit without an upgrade; we confirm before quoting
- Dedicated 240V circuit from panel to where you park
- Hardwired or NEMA 14-50 outlet depending on your charger and preference
- Permit and inspection where required by jurisdiction
What the photo wizard asks for
Your panel
Door open, breaker labels visible. Shows available capacity and brand (some brands need replacement).
Where you park
Garage, driveway, or parking area. Shows the run distance and mounting options.
The wall where the charger goes
Preferred mounting spot. Confirms surface material and conduit routing.